Investors

Invest in direct-
ammonia electric power.

One patent-pending fuel-cell platform, two application programmes. Our measured asset today is a laboratory cell; aircraft and vehicle performance must be established through staged, milestone-gated testing.

Programme 01 · VAANVIZHI

₹7 crore to build and
validate VAANVIZHI.

Planned Proposed · 24 months · four milestone tranches. Each tranche is released against its technical milestone.

T1 · months 0–6₹1.00 cr

Air-fed validation

Air-fed DAFC validation. Exit: repeatable air-fed results, independently reviewed.

T2 · months 6–12₹1.50 cr

CFD, FEA & structure

Flow, thermal and structural analysis and the aircraft structure. Exit: design freeze with verified mass.

T3 · months 12–19₹3.45 cr

Stack, aircraft & launcher

DAFC stack, aircraft and launcher build. Exit: integrated system running on the ground.

T4 · months 19–24₹1.05 cr

Ground & flight validation

Catapult launches, recovery and flight tests. Exit: flight demonstration and test report.

Built bottom-up from desk estimates (likely case ₹6.52 crore) with ₹1.19 crore contingency included; no supplier quotes yet. Each tranche is released only after an independently reviewed milestone. Equity, instrument and valuation are agreed privately with investors. No ammonia-powered flight is guaranteed; later tranches depend on earlier technical results. About VAANVIZHI →

Programme 02 · DAFC Auto Planned₹5 crore

Indicative · 24 months

  • 900 cm² active-cell development
  • DAFC-10 stack and controls
  • Ammonia-system validation
  • L5 engineering vehicle
Shared platform

One company.
One platform.

Electrochemistry, membrane and catalysts, IP, instrumentation, simulation and controls are shared by both programmes.

Investment is into H2ONE Cleantech Private Limited. The programmes are not separate shares and the amounts are not additive promises; a shared cost-allocation map is provided before simultaneous investors are brought in.

Evidence today

What exists,
and how it is labelled.

≈121mW/cm² peak, 5 cm² NH₃/O₂ laboratory cellMeasured
≈1.0 VOpen-circuit voltage at ≈70 °CMeasured
CAD + sizingDetailed VAANVIZHI CAD with coupled mass, energy and thermal sizing; FEA follows the design freezeModelled
PatentIN 202641059092 · filed 9 May 2026 · pending, not granted
Financial status

Founder-bootstrapped

No external investment has been received to date. Nothing on this website is an offer of securities, a valuation or a promised return.

Reporting

Monthly engineering updates

Investors receive monthly progress against the milestone plan and the full engineering risk register. See the risk register →

Next step

Request the deck or a
technical diligence meeting.